top of page

South Huron Valley Wastewater Treatment Plant

Sub contracted on behalf of Heaney General Contracting to extract and rebuild a "Baffle Wall." Our team spent a few days bringing this big time project to life. Not only did we weld this one together, but we ran the heavy equipment, managed the rigging, and set the concrete studs to anchor this frame to the existing foundation. This was a very fun, tedious project. We are happy with our final result and happy to have another satisfied client. Though we did not see the final end result (the boards that sit in between the frame posts). We do have a picture of the wall we took before extraction to give you a good referance.

20240822_113647.jpg
20240907_111509.jpg
20240907_133921.jpg
20240907_171445.jpg
20240908_112646.jpg
20240907_152731.jpg
20240908_145950.jpg
20240907_122838.jpg
20240907_122834.jpg
20240907_122851.jpg
20240907_152740.jpg
20240907_125026.jpg
20240907_161506.jpg
20240907_163116.jpg
20240908_125552.jpg
20240908_121937.jpg
20240907_125710.jpg
20240907_163056.jpg
20240908_095329.jpg
20240907_164620_edited.jpg
20240908_102928.jpg
20240907_100032_edited.jpg
20240907_163054.jpg
20240908_095044.jpg
20240908_125640.jpg
20240908_112639.jpg
20240908_125700.jpg
20240908_145318.jpg
bottom of page